310-519-1314 #alvasbfm

Alvas Floating Subfloor Additional Box

///Alvas Floating Subfloor Additional Box

Alvas Floating Subfloor Additional Box

$200.00

Alvas Floating Subfloor Additional Box is needed to cover each additional 225 sq ft of the do-it-yourself Floating Subfloor.

(Must have already purchased the Alvas Floating Subfloor Starter Kit)

PLEASE NOTE: By clicking Add to Cart you understand the Starter Kit (which includes the DIY instructions) must have already been purchased. The instructions must be followed for Alvas warranty to be valid.

Details

Alvas Floating Subfloor Additional Box is needed to cover each additional 225 sq ft of Alvas do-it-yourself Floating Subfloor. It includes foam blocks and screws only.

MUST have already purchased the Alvas Floating Subfloor Starter Kit.
(Refer to the Alvas Floating Subfloor Cost Estimator)

Made in USA

We Supply (Additional Box Includes):

  • Telephone Tech Support
  • Foam Blocks
  • Self Drilling Screws
  • You Supply:

You Supply:

(Refer to the Alvas Floating Subfloor Cost Estimator for exact quantities needed & recommendations where to purchase)

  • Birch Plywood Sheets
  • Yellow Glue
  • Spray Adhesive
  • Labor
  • Tools

(Refer to Alvas Floating Subfloor Starter Kit, sold separately, for more information)

Calculate Additional Coverage

Need help figuring out how much more coverage you need? Click here for the Alvas Floating Subfloor Cost Estimator 

Precautions

Heavy objects (over 100 lbs) cannot sit on any foam bottom floating floor for an extended period of time (more than 12 hours).

Prior to installation, make sure there is no water leaks or under-concrete water seepage, as no floor should be installed in any room if moisture penetration is suspected. The area must remain dry.

Shipping

Production Time

Production Time is usually 2-4 business days, plus transit time. (Transit time is determined by the shipping company)

Need it faster? Rush options

Need it faster? Call us and we’ll do our best to help! There is a chance we can rush your shipment and/or us an expedited delivery service.
Expediting Options:
– Rush Production Time ($50 Rush charge may apply)
– Expedited Delivery Service
– Will Call (Customer Pick Up)

Shipping Calculations

Alvas Floating Subfloor Additional Boxes ship UPS Ground, unless your order qualifies to ship Freight.*

* Shipments are calculated depending on the length, width and weight of packages. This includes, but is not limited to, Barres longer than 8′, the total weight of the order and/or any Glassless Mirror Panels. Barres longer than 8′ cannot be shipped by UPS Ground and must be shipped by motor freight. If shipping costs are a concern, you may consider several 4’ – 8’ barres or a combination thereof.

 

Refer to our FAQ for more information on Shipping, Returns and Product Guarantees.

Installation

MUST have already purchased the Alvas Floating Subfloor Starter Kit (starter kit includes the instructions for installation).

Step-by-step DIY instructions are included within Alvas Floating Subfloor Starter Kit.

An average size studio (about 1,000 sq ft) takes 2 people about 5 days to complete. (Always check local building codes and permit requirements before building anything yourself)

NOTE: The DIY instructions must be followed for Alvas warranty to be valid.

You may also like…